Zhongman International Petroleum Equipment (Beijing) Co., Ltd.
home products drilling rig substructure

substructure

Place of Origin:China Sichuan
Company Info
Company Published: 2007
Online Postings: Products , Selling Leads
Country/Territory: China
Business Type: Manufacturer, Trading Company
Number of Employees: 51 - 100 People
Contact this Member

« Prev Product ... 8 9 10 11 12 13 14 ... Next Product »
You can use the keys "←", "→" on your keyboard to turn pages
Detailed Product Description
Substructure Design Features
 
Continuously raising mast type substructure (parallelogram type)
Mast and drill floor share a common A-frame gin pole and are fixed on the base of substructure to achieve good integral stability.
Mast and drill floor are continuously raised by a common pulling-up line.  It takes 20 minutes to reach working position, quick and safe.
Mast alignment device is located at the leg of mast above drill floor for easy operation, power and time saving.
 
Continuously raising mast type substructure (parallelogram type)
Lighter load on drill floor, simplified raising structure, saving 10% total weight of mast and substructure
Module type mast is optional.
Adoptable by electrical drill rig with drill floor higher than 6m.
 
Simultaneously raising mast type substructure (parallelogram type)
Mast and drill floor share a common A-frame gin pole and are fixed on the base of substructure to achieve good integral stability.
It takes 15 minutes to raise mast and drill floor using a common pulling-up line.
Mast alignment device is located at the leg of mast above drill floor for easy operation, power and time saving.
 
Simultaneously raising mast type substructure (parallelogram type)
Lighter load on drill floor, simplified raising structure, saving 10% total weight of mast and substructure
Adoptable by mechanical drill rig with drill floor higher than 6m.
 
Vertically rising mast type substructure
Mast and drill floor share a common A-frame gin pole and are fixed on the base of substructure to achieve good integral stability.
Drill floor rising vertically without parallelogram pole, simpler structure and less raising power needed
Mast and drill floor are continuously raised by a common lifting line.  It takes 20 minutes to reach working position, quick and safe.

substructure substructure

Send a message directly to this member
« Prev Product ... 8 9 10 11 12 13 14 ... Next Product »
You can use the keys "←", "→" on your keyboard to turn pages

Other Products from this Supplier

Contact Us

Zhongman International Petroleum Equipment (Beijing) Co., Ltd.
[China]

Street Address : No.1801,Block B,Peking Times Square,Datun Road,Asina Olympic Village,Chaoyang District,Beijing,China

Province/State : Beijing

Country/Region : China

View Contact Details

Email this page Bookmark this page Print this Page

Contact this Member

Minimize